Fire Damage Reinstatement, Blantyre

Following a significant fire damage loss, we were appointed as Lead consultant, including Architectural, Contract Administration and Principal Designer Roles.

The role was from inception through to completion of the function hall to allow for continued trade and function delivery. Working with the Loss Adjusters, Building Control, Fire Services from the outset of the incident.

We were required to design and procure works to stabilise elements of the structure, partial demolition and thereafter reinstate and fully fit a new replacement function suite within a short period of time. This included intensive discussions and collaboration between Local Authorities, Loss Adjusters, Principal Contractor and the Club themselves.

This phase was a pre-curser to the reinstatement of the wider Miners Welfare Club facility buildings destroyed by the fire.

 

Client Blantyre Miners Welfare Club
Location Blantyre
Value £350,000 Phase 1
Year 2017

 

1
2c
2
4

  • Logo Rics Greyscale
  • Logo 9001 Greyscale
  • Logo 14001 Greyscale
  • Logo 18001 Greyscale
  • Logo Safecontractor Greyscale
  • Logo Aps Greyscale
  • Logo Apm Greyscale
  • Logo Cscs Greyscale
  • Logo British Safety Council Greyscale
  • Accreditation Arb